YellowDanfo
LOCAL NEWS

Railway: 10 more coaches coming by November- FG

Railway: 10 more coaches coming by November- FG
Railway: 10 more coaches coming by November- FG

The Minister of Transportation, Mr Rotimi Amaechi, says 10 more coaches will be provided by November to address the upsurge of passengers at railway stations across the country.

Amaechi told News Agency of Nigeria (NAN) on Tuesday that the additional coaches would solve the problem of high demand for the services.

He said: ”We delivered Abuja-Kaduna, but the pressure is now high with the influx of passengers. We started with about 300 passengers, now we are doing 2,500 passengers, nearly twenty times the number.

“We placed an order for some more coaches because the problem is not e-ticketing as they say, but the demand has by far outweighed the supply. By November we should be able to launch 10 more coaches to help address this challenge.”

The Minister explained that by November, two sets of Diesel Multiple Units (DMU) made up of motor car and coaches of various classes would be made available for the rail stations.

He expressed optimism that the coaches would assist in addressing the passenger surge at Abuja-Kaduna and Itakpe-Warri rail stations.

Meanwhile, the Managing Director, Nigerian Railway Corporation, (NRC) Mr Fidet Okhiria, said the DMU’s would be deployed to Lagos-Ibadan and Abuja-Kaduna routes.

Okhiria explained that by the time the other 32 coaches and the locomotives arrived, there would be additional round trips on the various stations.

”We are targeting 16 round trips on Abuja-Kaduna and at the same time Lagos-Ibadan and four round trips on Itakpe-Warri every day.

Commenting on the progress of the Lagos-Ibadan rail project, Okhiria commended the Minister of Transportation for ensuring steady and diligent supervision of the project.

He said: “It’s a good thing to come out ones every month to see the level of work they have done.

“I think our major issue now is to see how we can get to Apapa port because without the track getting to Apapa port the idea of making this rail has not been achieved.

“As you can see, it is quite pleasurable to travel by train, we used the narrow gauge within Apapa to Iju after which we used the standard gauge and we are very close to Ibadan.

“I think it is good to always do it like this, inspect it since the tracks have been done, because if we don’t, people may come and start vandalising it.

“It is a good thing, they have made progress and we hope by November when the coaches come, nothing will stop us from running train till we get to Apapa.”

Similarly, Malam Ibrahim Alhassan, Chairman NRC, commended the work done so far by the Chinese contractors.

For the first time, we were able to go into the Apapa wharf by train and it is all in the effort to show that whatever encumbrances there are, we will deal with them.

“This is to ensure that the target date of commissioning of this project which is January 2020 is realised.

“As we can see from Iju to Ibadan we have the tracks. In some areas, the formation of work has been done. We are relocating some of the narrow gauges to another place to give way for the new standard gauge.

“So generally, we are making progress but we are not very impressed with the pace of the work.”

Related posts

Mercy Aigbe- Seyi Tinubu Please Beg Your Father For Us

yellowdanfo

Nigerians must own anti-corruption fight to achieve success-Magu

yellowdanfo

Dr Baru felicitates with Nigerians, assures of adequate supplies

yellowdanfo

$8.4m forfeiture suit: Patience knows fate Feb 11

yellowdanfo

Buhari’s Aide-De-Camp Col. Abubakar Officially Hands Over

yellowdanfo

PHOTO: PASAN shut down NASS complex over unpaid salaries

yellowdanfo

Chris Iwarah spokesman for Air Peace Airline dies in a road accident

yellowdanfo

Wike Receives Oba Of Benin Calls For A United South-South Region

yellowdanfo

IGP Idris orders investigation into the death of Anita Akapson

yellowdanfo

Osun-2018: Senator Adeleke and Dr. Ogunbiyi sign a peace agreement

yellowdanfo

Leave a Comment